Design and Techno-Economical Optimization of Wind Turbine Generator System: Under Diverse Metrological Conditions

Authors

  • Marangi S. Mbogho Faculty of Engineering and Technology, Technical University of Mombasa, Kenya
  • Michael J. Saulo Department of Electrical and Electronics Engineering, Kenya

DOI:

https://doi.org/10.6000/1929-6002.2013.02.02.2

Keywords:

Techno-economical optimization, Wind turbine generator, Renewable energy optimal sizing, competing incentive, green economy

Abstract

The Kenyan Electricity Supply Industry (KESI) generation mix comprises; hydro-electric, geothermal, thermal and a small contribution from wind energy. Over the years, the predominant source of electricity generation in KESI has been hydro (over 60%). However, due to climate changes in recent times hydro generation has become less reliable and largely contributed to the supply–demand mismatch. Against this background there has been a paradigm shift in energy policy towards the use of Renewable Energy sources for electricity generation. Informed by this shift of policy, this paper explores the possibility of generating electrical power from wind-at Mokowe, Lamu County, in Kenya along the Indian Ocean. The paper contends that the use of optimally designed Wind Turbine Generators (WTGs) could enhance production of electrical power at the proposed site. This in effect would significantly: improve the technical and economic performance of KESI; and impact positively on the socio-economic status of the local communities at Makowe.

References

Gans F, Miller LM, Kleidon A. The problem of wind turbine – a note on a common but flowed wind power estimation method. Earth System Dynamics 2010; 1: 103-14. DOI: https://doi.org/10.5194/esdd-1-103-2010

Ministry of Energy, Kenya Electricity Access Investment Prospectus 2009-2014. Republic of Kenya, Nairobi 2009.

Saulo MJ, Gaunt CT. Implication of national policy on electricity distribution system planning in Kenya. Proceeding of the 19th South African Universities Power Engineering Conference, SAUPEC 2010; pp. 132-137.

Nichita C, Luka D, Dayko B, Ceanga E. Large band simulation of wind speed for real time wind turbine simulators. Power Eng Rev IEEE 2002; 22(8): 63-65. http://dx.doi.org/10.1109/MPER.2002.4312482 DOI: https://doi.org/10.1109/MPER.2002.4312482

Bayem H, Phulpin Y, Desante, Bect J. Probabilistic computation of wind farm power generation based on wind turbine dynamic modeling.10th International Conference on Probabilistic Methods Applied to Power Systems-.PMAPS 2008; Porto Rico, 1-6.

Billington R, Chen H, Ghajar R. Time series models for reliability evaluation of power systems including wind energy. Microelectronics Reliability 1996; 36(9): 1253-61. http://dx.doi.org/10.1016/0026-2714(95)00154-9 DOI: https://doi.org/10.1016/0026-2714(95)00154-9

Allerton T. Simulating the distribution and cross correlation of wind farm output, ESG164: Heriot-Watt University. The Knowledge Transfer Network for Industrial Mathematics, The international centre for mathematical sciences 2008 Report.

Aksoy Fuat H, Toprak Aytek Z, Erdem Nal A. Stochastic generation of hourly wind data. El-Sevier – Renewable Energy 2004; 29(14): 2111-31. http://dx.doi.org/10.1016/j.renene.2004.03.011 DOI: https://doi.org/10.1016/j.renene.2004.03.011

Kremers E, Viejo P. Simulations of energy system scenarios for regional planning decision making using agent based modeling.11th int. conf. on computers in urban planning and urban management. Hongkong, June 2009.

Kremers E, Lewald L, Barambones. Gonzalez de Durana O. argent –based multi-scale wind generation model. Proceedings of the ninth IASTED European conference power and energy systems (Euro 2009) Palma de Mallorea Spain.

Chedid Akiki R, Rahman S. A decision support technique for the design of the hybrid solar-wind power systems. IEEE Trans Energy Conversion 1998; 13(1): 76-83. http://dx.doi.org/10.1109/60.658207

Fernando D, Bianchi, Harnan De Battista, Ricardo JM. Wind turbine control system. Advances in industrial control series Springer 2007. DOI: https://doi.org/10.1007/1-84628-493-7

Akhamatov V. Variable speed wind turbines with Doubly-Fed Induction Generators. Wind Eng 2002; 26(2): 85-108. http://dx.doi.org/10.1260/030952402761699278 DOI: https://doi.org/10.1260/030952402761699278

Song YD, Dhinakaran, Bao XY. Variable speed control of speed turbines using non-linear and adaptive algorithms. J Wind Eng Ind Aerodynamics 2000; 85: 293-308. DOI: https://doi.org/10.1016/S0167-6105(99)00131-2

Pena R, Clare JC, Asher GM. Doubly fed induction generator using back to back PWM converters and its application to variable speed wind-energy generation. Proc Inst Elect Eng 1996; 143(3): 231-41. DOI: https://doi.org/10.1049/ip-epa:19960288

Wei Q, Wei Z, Aller JM, Ronald GH. Wind speed estimation based Sensor less Output Maximization Control for Wind Turbine Driving a DFIG IEEE Trans. On Power Electronics 2008; 23(3): 1156-69. DOI: https://doi.org/10.1109/TPEL.2008.921185

Herbert GM, Iniyan Sree-Valsan S, Rajapandian S. A review of wind energy technologies. Renewable Sustainable Energy Rev 2007; 11: 1117-45. DOI: https://doi.org/10.1016/j.rser.2005.08.004

Siegfried H. Grid integration of wind energy conversion systems John Wiley and Sons Ltd 1998 ISBN 0-471-97143-X.

Yazho Mullane L, Lightbody G, Yacamini. Modeling of the wind turbine with a Doubly Fed Induction Generator for Grid integration studies. IEEE Trans Energy Conver 1998; 13(1): 76-83. http://dx.doi.org/10.1109/60.658207 DOI: https://doi.org/10.1109/60.658207

Novotny DW, Lipo TA. Vector control and Dynamic of AC drives Oxford, U.K. Oxford Univ. Press 2000.

SimPowerSystems 5.Users Guide, the Maths Works.

Downloads

Published

2013-05-20

How to Cite

Mbogho, M. S., & Saulo, M. J. (2013). Design and Techno-Economical Optimization of Wind Turbine Generator System: Under Diverse Metrological Conditions. Journal of Technology Innovations in Renewable Energy, 2(2), 106–114. https://doi.org/10.6000/1929-6002.2013.02.02.2

Issue

Section

Articles